龙虎国际娱乐网址

    1. <form id='Tcspjp'></form>
        <bdo id='Tcspjp'><sup id='Tcspjp'><div id='Tcspjp'><bdo id='Tcspjp'></bdo></div></sup></bdo>

          • 龙虎国际娱乐网址主营:Taber耐磨试验机,马丁代尔摩擦试验机,PV1210盐雾循环试验箱,ATLAS氙灯老化试验机,38DLPLUS超声波测厚龙虎国际娱乐网址
            站内搜索
            联系我们
            电  话: 021-32535039
            传  真: 021-32535039
            手  机: 13472521719
            网  址: dingzhi17.com
            联系人: 谢文清
            邮  箱: xiewenqing2000@126.com
            地  址: 上海市嘉定区德富路1198号803室太湖世家国际大厦
            FLTM BI107 THERMAL SHOCK TEST FOR PAINT ADHESION

            FLTM BI107 THERMAL SHOCK TEST FOR PAINT ADHESION

             品牌:Electro-Magic  型号:8M1100  加工定制:否  
             冲击能量:1 J 冲击速度:1 m/s 外形尺寸:200x100x50 mm 
             重量:50 kg 适用范围:汽车油漆热冲击试验   
            产品特性:THERMAL SHOCK TEST FOR PAINT ADHESION ,THERMAL SHOCK TEST FOR PAINT ADHESION ,THERMAL SHOCK TEST FOR ,FLTM BI107
            产品简介:品牌:Electro-Magic ;型号:8M1100 ;加工定制:否 ;冲击能量:1 J;冲击速度:1 m/s;外形尺寸:200x100x50 mm;重量:50 kg;适用范围:汽车油漆热冲击试验
            龙虎国际娱乐网址
            详细介绍:
            THERMAL SHOCK TEST FOR PAINT ADHESION 

            E1

            e2

            e3
             

             

                                                               Application
            This procedure is used to determine the resistance to coating adhesion loss of coated surfaces of aluminum,plastic, steel, and other substrates when subjected to a wet blast similar to that produced by vehicle wash equipment.

             

             

                                       Apparatus and Materials Required
            Film Thickness Gauge
                  per Ford Laboratory Test Method BI 117-01
            Carbide Tip Scribe
                  CTS (General Scribe #CM 88) - or equivalent
                 12015 Telegraph Rd.
                 Detroit, Michigan U.S.A.
                 (313) 531-7668
            Utility Knife
                  Stanley, Quick Point 10-300 - or equivalent
                 (break away tips)
            Water Immersion Tank
                 Per Ford Laboratory Test Method BI 104-01
                Note:  Thermal shock testing requires:
                    a.  38 +/- 2 °C water temperature
                    b.  5 ppm maximum dissolved solids
            Heater/Circulator
                   Fisher Scientific 13-874-70J - or equivalent
            Dissolved Solids Meter
                  Myron L Company - or equivalent
                  833 East Broadway
                  San Gabriel, California
            Freezer
                  Capable of minus 29 +/- 2 °C temperature 

            Steam Generator
               a.  Input flow of water to be 2.7 +/- .1 L/min (*).
               b.  Nozzle diameter to be 12.5 +/- .3 mm ID and at least 100 mm long.
               c.  Discharge dynamic head to be 37.9 +/- 1.9 kPa measured 25 mm from the nozzle  using 
                  a   4.7 mm ID tube. A substantially non-diverging discharge is required for this test
             (see Figures 1 and 2).
            Note:  Electro-Magic Model 100 (and the earlier Model 60) Steam Generator available only 
                  from:Atomic Cleaning Systems, 31651 West Eight Mile Road, Livonia, MI 48150, Phone: 
            ??       (248) 615-4400, has been found to be satisfactory. The Model 100 or Model 60 are no 
            ??       longermanufactured directly by Electro-Magic. However, Atomic Cleaning Systems is
            ??       capable ofmodifying new Electro-Magic models to meet the Model 100 specifications
                   required for this test.Milwaukee 1/2 inch globe valve No. 1151-1161, 150 SWP 300 WOg
            ??      is adequate for use in  standardization of generator.
            Model 100 Steam Generator
            (*)    The pumping pressure is directly related to the input flow rate. The pressure needed for
                    therequired flow can be determined by measuring the pump pressure and discharge
                    flow rate withthe burner off. When the burner is turned on, the required flow rate is
            ??        obtained by readjusting to the required pump pressure.
            (**)    This is done by placing the tube midstream 25 mm from the nozzle. The tube size must  
            ??         not bevaried because the densities and velocities are not uniform throughout the cross
            ??        section of thedischarge stream.
            (***)  Adjusting the discharge dynamic head may be required. This must be done in such a
                  way thatthe input flow rate as specified in Para (a) above is maintained. This is done by
                 adjusting the amount of heat transferred to the water. Increasing the heat will cause the
                 flow rate (pressure) of (a) to change. It must be readjusted. This operation will result in an
            ??      increased dynamic pressure; to decrease it, decrease the heat and then adjust the flow
            ??    (pressure).

            Thermometer
            ??       Capable of measuring 100 +/- 2 °C
            Face Mask
                  Full face cover safety mask is required when performing this test.
            Gloves
                 Gauntlet-type gloves for protection of hands are required.


                                                Conditioning and Test Conditions
              All test values indicated herein are based on material conditioned in a controlled atmosphere of 23 +/- 2 ??C and 50 +/- 5 % relative humidity for not less than 24 h prior to testing and tested under the same conditions unless otherwise specified.

                                                                      Procedure
            1.  Standardize the Model 60 or Model 100 Steam Generator.
                a.  Measure and maintain the input flow at 2.7 L/min. Install a 12.5 mm globe valve in the
                    steam line between coil weld assembly and a 5/32 inch hose nipple. With burner off,
                     engage pump and adjust globe valve until 2.7 L/min is obtained.
                    Record the tank pressure that is obtained with the 2.7 L/min flow rate. (This induced
                     back pressure simulates the pressure that steam exerts on the system while the burner
                     is on.)
               b.  Measure and maintain the mean dynamic head at 37.9 kPa (5.5 psi) using the fixtures as
                   described in Figures 1 and 2. Open globe valve and turn on the burner. Allow tank
                   pressure   tostabilize before reading the mean dynamic head. Adjustments of the
                   dynamic head are to be  made by changing the amount of heat transferred to the water
                   at the burner. (The flow  rate, as  specified above, must be maintained.)
                c.  Measure and maintain a 98 +/- 2 °C temperature of the steam blast at the test
                    sitedistance.

            2.    Measure film thickness per Ford Laboratory Test Method BI 117-01 at proposed test sites
                 and record.
            3.  Immerse the parts or panels (previously prepared per Engineering Materials Specification)
                 in the water immersion tank for four hours at 38 +/- 2 °C. Aerate the water by placing 6.5
                 mm ID plastic tube at the bottom of the tank and bubble air at a rate of one bubble per
                 second minimum. Maintain a 5 ppm maximum dissolved solids (as NaCl) in the water.
                 Check and record NaCl level using a dissolved solids meter.
            4.  Remove the samples after four hours of water immersion and cut an "X" through the
                  coating into the substrate across the panel or part where feasible (see Figure 3).
                  a.  Use a scribe to make the cut if the substrate is metal or hard, rigid plastic.
                  b.  Use a utility knife to make the cut if substrate is an elastomeric material.
            5.  Place the test samples in a freezer at minus 29 +/- 2 °C for a three hour minimum freeze
                cycle.
            6.  Within 30 seconds from freezer removal, direct the steam blast at the center of the "X" cut,
                at a distance  of 2 to 3 inches and 45° to the sample, in the direction shown in Figure 3.

             Note:  High pressure wet steam represents a potential safety hazard. Not only is it necessary|
                        to secure the samples properly, but full face protection and gloves are required.
            7.  After 30 seconds, record area (mm2) of coating removal by visually measuring with a
                  metric ruler  (typical triangular coating removal: Area = 1/2 Base x Height). Also examine
                  the surface and report  any blushing, whitening, or loss of gloss.
            8. If a failure occurs, note number of seconds after steam black initiated that the failure 
                  occurred.


            Chemicals, materials, parts, and equipment referenced in this document must be used and handled properly.
            Each party is responsible for determining proper use and handling in its facilities.
                                                                 ATTACHMENT ONE
                                                                  RATING SCALE FOR
                                                         THERMAL SHOCK TEST PANELS

                                                                RATING               PEEL BACK
                                                                        20      =       No removal
                                                                        19      =       < 0.5 cm^2
                                                                        18      =       < 1.0 cm^2
                                                                        17      =       < 1.5 cm^2
                                                                        16      =       < 2.0 cm^2
                                                                        15      =       < 2.5 cm^2
                                                                        14      =       < 3.0 cm^2
                                                                        13      =        < 3.5 cm^2
                                                                        12      =        < 4.0 cm^2
                                                                        11      =        < 4.5 cm^2
                                                                        10      =        < 5.0 cm^2
                                                                         9       =         < 5.5 cm^2
                                                                         8       =         < 6.0 cm^2
                                                                         7       =         < 6.5 cm^2
                                                                         6       =         < 7.0 cm^2
                                                                         5       =         < 7.5 cm^2
                                                                         4       =         < 8.0 cm^2
                                                                         3       =         < 8.5 cm^2
                                                                         2       =         < 9.0 cm^2
                                                                         1       =         < 9.5 cm^2
                                                                         0       =          > 9.5 cm^2
                                              SEE SPECIFICATION FOR ACCEPTANCE CRITERIA RATING

             

            undefined

                                                                    Figure 1

            undefined
             

                                                                     Figure 2

             undefined

                                                                             Figure 3

            undefined

                                                                Figure 4

            龙虎国际娱乐网址
            联系人:谢文清   联系电话:021-32535039   手机:13472521719   传真:021-32535039   联系地址:上海市嘉定区德富路1198号803室太湖世家国际大厦
            沪ICP备12035321号   技术支持:谷瀑环保   管理入口